Star EG – Titling on new site towers and developments
The Star Gold Coast is a premier entertainment destination. Offering a world class hotel, award-winning dining, lively bars, spectacular entertainment & a 24-hour casino.
The Star Gold Coast, originally Juniper's Casino was developed in the 1980’s and is located in the heart of Broadbeach. The Star remains one of the Gold Coast’s and Queensland’s major tourism draw cards with its luxury accommodation, stunning facilities and live entertainment offerings. Bennett + Bennett have proudly been involved with this property for over 20 years, providing various surveying and laser scanning services. As a Gold Coast based company since 1968, we are proud to be associated with this landmark site.
SERVICES:
- Surveying
Construction set-out
Monitoring
Detail surveys
- Laser Scanning (High Definition Surveying)
- Titling
TIMELINE:
1993 Glenzeil – Major multi-carparking extension.
1995 / 2009 Weathered Howe / Conrad Jupiters – As constructed survey to determine movement of the Level 1 carpark.
2003 Glenzeil – High Rollers extension.
2004 Glenzeil – Auditorium upgrade.
2005 Frankipile – Set out and monitoring of piling & the overhead bridge structure connecting pedestrians from Jupiters Casino & the Gold Coast Convention Centre.
2006 / 2007 Cover Structures – Sail cloths over external walkways – detail & set out.
2007 Conrad Jupiters / Uretek- Set up and level of monitoring points in level 1 carpark.
2008 / 2013 Tabcorp – Carpark slab & structure monitoring (level movement).
2008 ECS Group / Hyder Consulting – Set out & checking of carpet & tile lines in the level 1 lobby area.
2009 – Austress Mernard – Carpark remediation works, stages 1, 3 & 5.
2007 / 2011 Tabcorp – Stabilisation works in carpark – Levels BMT 1 & BMT 2
Jul 13 / Jul 14 Echo Ent – Monitoring of level movement adjoining the BMT 3 carpark.
Oct 2013 Hyder Consulting – Conduct level survey of executive suites on level 4.
Nov 2014 Echo Ent / Hyder Consulting – BMT 3 main wall locations & various spot levels on the slab floor.
Nov 2014 Echo Ent – Floor levels through Prince Albert Bar.
Dec 2014 Butler Partners – Borehole & test hole locations – swimming pool.
Dec 2014 Butler Partners – Geotech investigation for the new tower site. Includes set out & as-constructed location of borehole spots.
2014 / 2015 Hyder Consulting / Echo Ent – Detail survey of the casino driveway the entire length from the south bridge-to-north bridge inclusive.
June 2015 Point PM – 3D laser scanning of High Rollers room, level 21 for redesign of new High Rollers areas.
2014 / 2015 Hyder Consulting / Echo Ent – Detail survey of courtyard area where function rooms expand & breakout.
April 2015 Echo Ent – Detail survey of eastern loading dock area.
April 2015 Echo Ent – Location of specific trees in driveway for the set up of tree &driveway lighting.
May 2015 Echo Ent – Location of exposed floor & steel support structure for Prince Albert Bar extensions.
Aug 2015 / 2016 Buildcorp – Construction control set out for the Prince Albert Bar extensions (Garden Bar).
2015 / 2017 Mainland Civil – Construction control for hotel tower suite, cooling tower & MCEP.
2016 ATG projects – construction control for Euro Bar & Dumpling Bar.
2016 / 2017 – Star EG – laser scan survey of main gaming floor expansion.