Project Details

KURABY TO BEENLEIGH, QLD
LOGAN AND GOLD COAST FASTER RAIL
DEPARTMENT OF TRANSPORT AND MAIN ROADS
ONGOING

The rail line between Kuraby and Beenleigh is a key capacity bottleneck on the network, where trains share a single track in each direction. During peak periods, all-stop Beenleigh trains need to be held to one side to allow Gold Coast express trains to pass through.

The Logan and Gold Coast Faster Rail project will address this problem by doubling the number of tracks between Kuraby and Beenleigh to allow the free movement of both all-stops and express trains. The project will also upgrade stations to improve accessibility, remove 5 level crossings, improve park ‘n’ ride facilities, and provide a new continuous active travel path connecting to stations along the 20km project corridor. 

Bennett + Bennett was engaged by TMR to undertake various survey packages to support the design development. This involved a comprehensive Ground and Feature Model (GFM)and Scan to BIM of Loganlea Station, Aerial Laser Scanning and Photogrammetry of the full corridor and surrounds and significant GFM and services investigations along the route. This included coordinating works within the rail corridor and managing  spatial data captured from various sources.
Bennett + Bennett’s subsidiary, SiteDE provided Digital Engineering consulting and completed existing conditions modelling that enables seamless integration across design consultants and stakeholders.

SERVICES:

  • Terrestrial Laser Scanning
  • Aerial Laser Scanning
  • Photogrammetry - Reality Mesh 
  • Ground and Feature Modelling 
  • Underground Service Location
  • Scan to BIM
  • Digital Engineering
Development application new KFC and Starbucks

Project Highlights

    Our Current Projects

    Established in 1968 on the Gold Coast, we have been privileged to play a significant role in key projects and areas of development that have helped shape South East Queensland and NSW.

      Snowy Hydro 2.0, NSW

      Snowy Hydro 2.0

      • Location: TANTANGARA, NSW
      • Client: FUTURE GENERATION JV
      • Year Completed: ONGOING
      View Project Details
      Southern QLD Correctional Stage 2A, QLD

      Southern QLD Correctional Stage 2A

      • Location: GATTON, QLD
      • Client: JOHN HOLLAND GROUP
      • Year Completed: ONGOING
      View Project Details
      MacIntyre Wind Farm QLD

      MacIntyre Wind Farm

      • Location: CEMENT MILLS, QLD
      • Client: ACCIONA ENERGY
      • Year Completed: ONGOING
      View Project Details
      Courtney Drive  QLD

      Courtney Drive

      • Location: UPPER COOMERA, QLD
      • Client: GALLERY GROUP AND HB AUSTRALIA PTY LTD
      • Year Completed: ONGOING
      View Project Details
      Mermaid Waters, QLD

      The Lakes, Mermaid Waters

      • Location: MERMAID WATERS, QLD
      • Client: SUNLAND GROUP
      • Year Completed: ONGOING
      View Project Details
      Maroochy Private Hospital MCNAB

      Maroochy Private Hospital

      • Location: MAROOCHYDORE, QLD
      • Client: MCNAB
      • Year Completed: ONGOING
      View Project Details
      Pumicestone Road, Caboolture, Qld

      Big Fish Car Wash & Subdivision

      • Location: PUMICESTONE ROAD, CABOOLTURE, QLD
      • Client: VAUXHALL PTY LTD
      • Year Completed: MARCH 2024
      View Project Details
      Mondrian Gold Coast, Gold Coast, QLD

      Mondrian Gold Coast

      • Location: GOLD COAST, QLD
      • Client: HUTCHINSON BUILDERS
      • Year Completed: ONGOING
      View Project Details
      Primary Schools Reconstruction after Floods, NSW

      Primary Schools Reconstruction after Floods

      • Location: TWEED SHIRE, NSW
      • Client: ADCO CONSTRUCTION
      • Year Completed: ONGOING
      View Project Details
      Gold Coast Light Rail ongoing

      GOLD COAST LIGHT RAIL | STAGE 3

      • Location: GOLD COAST, QLD
      • Client: JOHN HOLLAND
      • Year Completed: ONGOING
      View Project Details
      Gold Coast Light Rail ongoing

      NEW COOMERA HOSPITAL

      • Location: COOMERA, GOLD COAST, QLD
      • Client: MULTIPLEX
      • Year Completed: ONGOING
      View Project Details
      Gold Coast Light Rail ongoing

      SUR KIRRA BEACH DEVELOPMENT

      • Location: GOLD COAST, QLD
      • Client: CRU COLLECTIVE
      • Year Completed: ONGOING
      View Project Details
      Cross River Rail station construction at Pimpama on the Gold Coast

      CROSS RIVER RAIL | PIMPAMA RAIL STATION

      • Location: PIMPAMA, GOLD COAST, QLD
      • Client: ADCO
      • Year Completed: 2025
      View Project Details