Project Description
Tully Timber Bridge Replacement
Tully, QLD
Client: Arup / QR
Year Completed: 2019
QR are replacing the Timber Bridges along the North Coast Line. This project consisted of nine bridges in Tully, North Queensland. Seven are on the Murray Flats, one is bridging Boongarri Creek and one is bridging Weedy Creek.
Bennett + Bennett undertook detail and laser scanning surveys of each of the nine timber bridge sites. The survey captured high detail on the existing bridges and abutments and also included the approaches in either direction. The survey was presented and delivered to QR specifications. Our surveyors also completed dilapidation surveys which involved capturing high definition video footage throughout the corridors and also the entrances.
Services:
- Surveying
- Detail Surveys
- Laser Scanning
- Modelling
- Rail Surveys
- Service Location
- Dilapidation Surveys